                              TC Report

All node TC alert nodes triaged should be documented on the SWAT sheet.

  See the TC Report Job Aid on the Wiki for more details. Click on the TC Alert Report Generator to automate the process.



Cut-in JB formatting:

Tech Name:
Contracting company:
Phone number:
Sphere #:
Aerial/UG/or both?:
Address:
Scope of work:
ETR:




Processes & Fiber

                                                                                                                                                                                     

NNOC Fiber Fiber Severity


Central NNOC - Fiber - Fiber Procedure [Draft]


Wiki Home - NNOC


Wiki Home - Central Division HFC


Process Documents - Central Division HFC


Contacts & Distro Lists






FIBER CHECKLIST


XFM-R   |   Line Count & Baseline   |   RPD Scraper   |   Fiber Detail Summary Form [comma]   |   Comma seperator   |   IA Formatter   |   IOP Checklist   |   Fiber Walk-thru   |   Fiber Severity

Node(s) Fiber Events: 


Fiber JB Team groups - "LT" = Local Fiber team | "CT" = Construction contacts

 



  For Multi-Site 5+ Metro-E | 1-49 WSE / CBH Events, Create a Fiber Task, and select "Actions" and select "Refer to headend" to create a HE task. Before assigning the JB to the team, Create an INC ticket, add it to the JB, and then assign the JB to the team.


  Create a Fiber Task, assign to team, and select "Actions" and select "Refer to headend" to create a HE task.

  Send initial Fiber e-mail using the Fiber Detail Summary Form. You can use the Comma Separater Tool to quickly paste the sorted node list in the fiber e-mail.

  Heartland  | Chicago. [Click-to-copy MS teams fiber groups].   **Chat Adds**.

  Add the title in the chat label , and then start a fiber loop to pin the Fiber Event Detail Summary.

  After a fiber event is announced, convert IOP ticket using the IOP Fiber Checklister using code 10444.
  Update the IOP checklister. Deflection ETR is near the mitigate button.
  Use the IA Formatter to easily format IA content. IA's go out for all fiber events including CBH events not impacting nodes.
  Merge JBs see demo. Merge IOP jobs see this demo.
  Closing the eventAfter hands-off and sending the final IA, Close all JB's, TTS tickets, merged JB's. End the chat with a conclusion announcement.
  Mitigate and resolve the IOP Checklister. Mitigated Technical Update [Click-to-copy] and Resolution Notes. [Click-to-copy]

Chat Summary:


Note, As of 9/17/25, a bridge will only be opened for fiber events that are either over the 4-hour mark, or meet the SEV 2 criteria using a MS teams Bridge.